Behavior of the Main take-down (WMF) table after the technical processing

I. Carry out technical processing:

  1. The 设计花型 is opened.
  2. The desired structure is generated.
  3. Pattern related changes were made in the 主牵拉(WMF) control column.
    1
    Start the technical processing for the selected pattern by the button in the 起头 ribbon under 衬经工艺.
  1. The result is shown in the pattern name... document window by the unprotected symbol view.
  2. 2
    Click the Setup 数据 icon in the 起头 ribbon under 参数.
  1. The Setup 数据 tool window appears.

:
Sub-rows with calculated values for some fabric take-down values will be generated by the technical processing.

Attention:
If you change a value in a sub-row, it will not be adapted automatically when changing the pattern width.