System sequence and mirrored system sequence

In these columns you can allocate jacquard system sequences.
With a system procedure the number of systems, number of yarn carriers and the knitting sequence are specified with which the jacquard is to be worked. Only those system sequences are offered for which the number of colors matches the jacquard present in the pattern and the number of systems from the system sequence is identical to the number of systems of the set machine.

In the designation of the system procedure it is specified how many yarn carriers per color are used. For example, the name 1Y indicates that one yarn carrier is used per color.

The following functions are available in the context menu of this column:

Entry

Function

System sequence column

 

1Y
to ...

Select the system sequence with the desired yarn carrier number and allocate to the jacquard area.

No system sequence

Do not use any jacquard system sequence

Mirrored system sequence column

 

Mirror system sequence

Mirror the system sequence in order to change the side of the yarn carrier home position.
The system process then begins from the other direction.

Do not mirror system sequence

Delete mirroring.
Do not mirror jacquard system sequence.

Allocate system sequence:

  1. Jacquard area over the entire width of the pattern
    1
    Open the context menu of the System sequence column.
  1. Appropriate jacquard system sequences are offered.
  2. 2
    Select the system sequence with the desired yarn carrier number and allocate to the jacquard area.
  3. Additional yarn carriers appear in the magazine of the yarn carrier allocation.
  4. 3
    Check the yarn carrier home position in the magazine.
    4
    Enter Mirror system sequence in the Mirrored system sequence column in order to change the side of the yarn carrier home position.